Two Cold Box machines with its accessories weighing a total of 120 tons and each measuring 4 x 4 x 25 were transported to the Gachsaran Petrochemical Complex site under construction after being cleared from import sources and soon it will be ready for installation and then through the technical stages of testing and commissioning.